Survivor Tents
Natural Disaster
SAR MODULAR Central Kitchen – Disaster Response Plan
Provide emergency nutritious meals during disasters when normal food supply chains are disrupted.
Ensure rapid deployment of Central Kitchens as part of SAR & Relief Operations.
Support both victims and first responders (SAR teams, medical teams, military, police, volunteers).
Purpose & Objectives
Natural Disasters: Earthquakes, tsunamis, floods, volcanic eruptions, hurricanes, landslides, wildfires.
Man-Made Disasters: Building collapses, industrial accidents, transportation accidents, terrorist attacks.
Scope of Disasters
Phase 1 – Preparedness: Pre-stock food, train staff, coordinate with agencies.
Phase 2 – Response: Deploy mobile kitchens, distribute hot meals and ready-to-eat packs.
Phase 3 – Recovery: Scale up production, transition to community meal programs.
Operational Framework
Menu Planning
Standard Hot Meals: Rice, vegetables, egg/tofu/tempeh, chicken/fish.
RTE Packs: High-protein biscuits, instant porridge, noodle cups, canned sardines.
Special Needs: Baby food, elderly-friendly meals, medical diets.
Capacity & Scalability
One Central Kitchen: 3,000 meals/day (baseline).
Emergency Surge: 10,000 meals/day with mobile units.
Network of Kitchens: 10 kitchens = 30,000 meals/day capacity.
Land Size Recommendation
Baseline: 10m x 20m = 200 m²; Expansion: 20m x 20m = 400 m².
Building Layout (Baseline 20m x 20m)
Zone
Receiving & Storage
Preparation Area
Cooking Area
Packaging Area
Dispatch & Loading
Support & Utilities
Function
Dry/cold storage, freezer
Washing, cutting, sorting
Steamers, boilers, stoves
Tray filling & sealing
Truck/van outbound
Staff, toilets, generator
Core Equipment List
Cooking & Prep: 5 rice cookers, 3 steamers, 4 woks, 10 prep tables, 6 sinks.
Cold & Dry Storage: 2 cold rooms, 1 freezer, 5-ton racks
Utilities: 1 generator (50 KVA), water filter, fire safety
MODULAR CENTRAL KITCHEN
Modular container construction can provide the perfect solution for clients, designed to be flexible, prefabricated, quick to assemble, and easy to transport. The sandwich panel manufacturer uses light steel structures as the base floor load, fully utilizing the strength of sandwich wall panels and roof panels, and adopting effective connection methods.


Advantages
- Easy to Move
- Quick Installation
- Durable
- Low Cost
- Earthquake Resistant (Magnitude 8 SR)
- Fire Resistant up to 1200 °C
- Maintenance-Free
- China Technology
- Waterproof & Leak Resistant
- Heat Resistant
Components
- Main Steel Structure
- Steel Connection Corner
- Wall Panel
- Side Pillar
- Fireproof MGO Board
- Indoor Ceiling


Modular container construction can provide the perfect solution for clients, designed to be flexible, prefabricated, quick to assemble, and easy to transport. The sandwich panel manufacturer uses light steel structures as the base floor load, fully utilizing the strength of sandwich wall panels and roof panels, and adopting effective connection methods.
SAR MODULAR Central Kitchen
Proposal Donation
Capital Setup for Nationwide Deployment
Target: 100 kitchens across 20 provinces; Baseline per kitchen: 2B; Total: ~200B
Operation Cost for Meal
One Central Kitchen: 3,000 meals/day (baseline).
Emergency Surge: 10,000 meals/day with mobile units.
Network of Kitchens: 100 kitchens = 300,000 meals/day capacity.
One Central Kitchen: 3,000 meals/day (baseline)
Network of Kitchens: 100 kitchens = 300,000 meals/day capacity
Estimated Cost Meal: IDR 20.000 per meal = x 300,000 meals/day capacity
Total Cost of Meal: IDR 6.000.000.000 (USD 365,853)
Astrans (s) PTE LTD
Operation Office : Asia Representative
Admin office : Foundation Lestari Nusantara Indonesia
Unit no : #04-11
No 3 Gambas crescent
Nordcom Building 1, Singapore 757088
Mobile No. : 96317749 ( Edmund )
Email : edchew9966@gmail.com
For Further Enquiry Contact Us
Sustainability
Promoting environment-friendly community development initiatives.
Community
Conservation
info@nusantarafoundation.asia
+62 21 38750043
Yayasan Lestari Nusantara Indonesia© 2025. All rights reserved.